Project Portfolio
Recent Featured Projects

Kaslo River Bridge Replacement- Kaslo, BC
- Hall Constructors Ltd.// Ministry Of Transportation
Spring- Winter 2021
Blackbird Industrial Ltd. was tasked with providing supervision and various demolition/installation services on several aspects of this project. Activities included: Temporary detour 40m steel girder bridge erection and installation across Kalso river, existing creosote timber bridge removal, demolition, and disposal, excavation, underground utility ( water, sanitary, storm) installation, road grading, paving support, pile driving support, concrete forming, and new bridge erection/ construction.

Keystone Bridge Replacement- Mission, BC
- AXCO Construction
Winter/ Spring 2022
Blackbird Industrial Ltd. provided engineering, design, quality assurance, and overall project management services on a 10+/-m span bridge.

Powell River Marine Outfall- Powell River, BC-
JJM Construction Ltd. // City Of Powell River
Spring/ Summer 2022
Blackbird Industrial Ltd. had the opportunity to provide supervision, key manpower, and support equipment to fabricate and install an 800m long 900mm diameter marine outfall in Powell River, British Columbia as part of a larger wastewater treatment facility upgrade. This challenging project highlighted Blackbird's commitment to the highest safety, environmental, and quality standards.

A- Avenue Waterline Replacement- Kaslo, BC-
Brenton Industries// Village Of Kaslo
Fall/ Winter 2022
Blackbird Industrial was able to provide key supervision, manpower, and equipment to fabricate and install a new 700m+ long 250mm dia. fused HDPE water main complete with air release chambers, future PRV station, and multiple tie-ins. Project scope involved demolition/ removal of existing infrastructure as well as controlled density fill of abandoned water main.

Tamen Creek Culvert Replacement- Rose Lake, BC-
Enviro- Ex Contracting// Ministry Of Transportation
Summer 2023
Blackbird Industrial was able to provide key planning, supervision, and tools to fabricate and install a new 40m+ long 5.5mm dia. multiplate culvert complete with cast in place head wall structures. Multiplate structure construction consisted of over 180 individual pieces, 5400+ bolts and a rigid installation/ quality control process.

Cervus Creek Bridge Replacement- Gold River, BC-
Enviro-Ex Contracting// Ministry Of Transportation
Fall 2023- Summer 2024
Blackbird Industrial was responsible for much of the planning, supervision, and execution of this highly successful bridge replacement project on Highway 29. Project scope included construction and eventual removal of 30m detour road/ bridge as well as demolition and safe removal/ disposal of the 40m existing creosote timber bridge structure. New bridge construction consisted of piling, cast in place "integral" abutment structures, steel girder superstructure, as well as a full depth cast-in-place concrete deck/ approach slabs.

Gowen Creek Bridge - North Bend, BC-
Cancon Construction //Ministry Of Transportation
Fall 2024
Blackbird Industrial was responsible for the supervision, key manpower/ equipment and execution of the cast-in-place substructure on this challenging project as well as providing access and support for rock/ soil anchor installation activities.